Aerial view of a natural-gas power facility at night

Portfolio — MW before acres

Capacity you can break ground on.

Every site in this portfolio has cleared T-IV DevCo's proprietary scoring framework — power, permitting, fiber, and development readiness, all verified before it reaches you. The intelligence behind the listing is the standard.

Status keyPower SecuredFeasibility CompleteIn Review

Active portfolio

Live inventory — sorted by MW.

Select a site to request a full brief, or pair with a turbine package.

6 of 6
WY-CHEYENNE-02Power Secured
400MW
Laramie County, WY · 640 acres
PowerBehind-the-meter + grid
FiberBuild required
WaterAir-cooled design
Timeline9–12 mo
Power SecuredUtility Letter in Hand
AZ-CASAGRANDE-05Power Secured
300MW
Pinal County, AZ · 380 acres
PowerBehind-the-meter gas
FiberLit — 1 carrier
WaterAir-cooled design
TimelineShovel-ready
Power SecuredShovel ReadyZoning Approved
TX-PERMIAN-01Power Secured
250MW
Permian Basin, TX · 420 acres
PowerBehind-the-meter gas
FiberLit — 2 carriers
WaterAllocated
TimelineShovel-ready
Power SecuredZoning ApprovedFiber Lit
ND-WILLISTON-06Feasibility Complete
220MW
Williston Basin, ND · 300 acres
PowerFlared-gas capture + gen
FiberBuild required
WaterPermitted
Timeline9–12 mo
Feasibility CompletePower Secured
OH-COLUMBUS-04Feasibility Complete
180MW
Central Ohio · 215 acres
PowerUtility + on-site gen
FiberLit — 3 carriers
WaterPermitted
Timeline6–9 mo
Feasibility CompleteFiber LitZoning Approved
GA-SAVANNAH-03In Review
120MW
Coastal Georgia · 160 acres
PowerUtility — letter pending
FiberLit — 2 carriers
WaterAllocated
Timeline12+ mo
Zoning ApprovedFiber Lit
Aerial view of solar panels on green grass field

Sites built for clean power

Power secured. Zoning approved. Ready to build.

The standard

What "shovel-ready" actually requires.

Most sites use "shovel-ready" as marketing. We define it in four verifiable gates.

Power secured

Behind-the-meter generation contracted or utility letter in hand. Not a promise — a signed instrument.

Zoning approved

Entitlements resolved at the county level. No variance risk remaining at the time of listing.

Fiber lit

Carrier presence confirmed, with redundancy where available. Build-required sites are flagged explicitly.

Water resolved

Allocation in hand or air-cooled design specified. Water is not an afterthought — it is a gate.

How we vet

The most rigorous site-scoring intelligence in the market.

Every site in this portfolio has been scored through T-IV DevCo's proprietary assessment framework — evaluating power access, interconnection status, permitting pathway, fiber, water, development readiness, and energy-to-market timeline. Sites that don't clear all gates don't reach the listing.

Power + energy

Behind-the-meter options mapped, BTM generation sources identified, grid interconnection status assessed at time of listing.

Permitting + regulatory

Zoning, water draw, density, and jurisdiction risk scored. Entitlements tracked to resolution status, not intent.

Development readiness

Fiber, access, site prep, and timeline-to-energized modeled. Sites are scored on when they can actually deliver, not when they could theoretically.

Proprietary tooling

T-IV DevCo's site assessment platform is AI-augmented — built to process and score at a speed and depth that manual diligence can't match. The intelligence behind this listing is the product.

Start a project

Need a site paired with power?

Tell us your MW requirement, timeline, and compliance posture. We'll match a vetted site to a turbine package — assessed, documented, and ready to move.